Chilled water production and district network
ABOUT THE PROJECT
Under a public service concession a chilled water district network of seventy kilometres and with 290 MW of injected cooling power cools 475buildings. Every year 20 MW capacity is added. Apart from environmental and energy advantages, the district chilled water production plants centralize the consumption of resources for cooling under controlled circumstances. A further improvement has been the change from the traditional wet cooling towers to the use of river water. Results have been considerable with respect to savings in CO2 emissions and consumption of electricity and water.
Visit the website
PROJECT DETAILS
Status
Certificate of Merit