ABOUT THE PROJECT
The network started 25 years with the use of waste heat from an industrial plant. After closure of the plant in 1993, it was replaced with a bio fuel-based CHP-plant. Network expansion continued and another bio fuel-based CHP plant was added. Municipalitys energy plan stipulates that district heating is preferable and that energy production shall be based on renewable fuel. In 2010 98% of heat in the district heating system will be based on biomass. A small district cooling system is also installed. The system has led to considerable reductions of CO2 emissions.
Visit the website
PROJECT DETAILS
Status
Certificate of Merit
Owner
Falu Energi & Vatten AB
Collaborators
Municipality