Hopes to connect District Heating networks in Milan
ABOUT THE PROJECT
The City of Milan has a population of about 1.300.000 inhabitants. District Heating service in Milan started in the early 90s, mainly based on heat production from WTE plants and from natural gas fuelled CHP plants (CCGT and CHP engines). The heat produced is fed to the buildings by means of several large district heating networks of which Canavese is the most recent one.
At present these networks are separated but there is a program to interconnect them in the next few years to better optimize and develop the whole system. In the framework of general agreement between A2A Group and the Municipality of Milan it is under development a plan to strongly expand the district heating in Milan Municipality by mean of an increase in the thermal power and efficiency of existing production plants and a significant extension and integration of the heat distribution networks.
Also, new production plants and district heating networks associated to them could be realized. The goal is to deliver the service, within year 2015, to more than 600.000 inhabitants equivalent and to increase at 1.200 MWt the thermal power installed at the condominium buildings.
Visit the website
PROJECT DETAILS
Category
Expansion of an existing scheme
Status
Award of Excellence
Collaborators
Municipality of Milan