Constant expansion leads to constant optimisation in Rossenheim
ABOUT THE PROJECT
The described energy system of the public utility company is situated in the city of Rosenheim, a town in the German State of Bavaria with a population of approximately 60.000 inhabitants. The city is located close to the Bavarian Alps and lies in between the two major cities of Munich (70 km) and Salzburg/Austria (90 km). Since the construction of the power plant in 1955 the SWRO operate a district heating network. The power plant was continuously expanded over the years and optimized in its efficiency. In 1963 a waste incineration was added to the power plant. To further increase the energy efficiency, three gas engines with a total electricity output of 10 MW were installed in 2004. Two more gas engines are currently under construction. Since 2008 the district heating network is expanded largely with the aim to double the percentage of district heating by 2020. The fuel input for generating heat and electricity is approximately equal in between natural gas and waste. The overall efficiency of the Rosenheim
generation is just under 70%. District heat directly replaces other input fuels and therefore reduces the emissions in Rosenheim.
Furthermore, the CHP generated electricity in Rosenheim blocks out other electricity generated with inefficient coal power plants somewhere in Germany. On the balance sheet the Rosenheim CHP electricity generation can thereby achieve a CO2 reduction.
Visit the website
PROJECT DETAILS
Category
Expansion of an existing scheme
Status
Award of Excellence