KJKP Toplane Sarajevo District heating

Sarajevo, Bosnia and Herzegovina
KJKP Toplane – Sarajevo

ABOUT THE PROJECT

Cantonal Public Utility Company KJKP Toplane – Sarajevo is the largest district heating system in Bosnia and Herzegovina. The district heating system is very specific. It consists of a large number of bigger and smaller area boiler plants with independent distribution networks. There are different types of systems: hot water or warm water, depending on size of facilities, with thermal capacities of particular boiler plants ranging from 600 kW to 56 MW. Within Toplane’s system, there is no cogeneration system for combined heat and electricity production. Total number of individual boiler-plants: 138 Medium and large-scale boiler plants: 47 Roof top boiler plants: 91 Installed capacity: 503 MW Engaged capacity: 323 MW Distributive network: 82 km Heating substations: 146 Number of heated flats: 50.194 Number of heated buildings: 1.492 Number of heated business premises: 2.471 Main fuels: Natural gas Alternative fuel Light and heavy fuel oïl.

Visit the website

PROJECT DETAILS

Category

Applications

Status

Owner

KJKP Toplane – Sarajevo

Collaborators